Fire Station Market Bosworth

Fire Station Market Bosworth
Client : Leicestershire Fire and Rescue Service
Surveyor : Hutchinson’s Surveyors

The brief

The upgraded fire station in Market Bosworth will improve the functionality of on duty conditions for firefighters in the area.

Sabin Consulting Engineers were appointed to undertake the M&E design for the complete refurbishment and extension of the existing fire station. The purpose of the project is to refurbish the fire station and also improve facilities for the firefighters. Improved facilities for the firefighters include refurbished training room, showers, locker room, changing room and gym. The project was completed in 2024.

Solution

The upgraded fire station in Market Bosworth will improve the functionality of on duty conditions for firefighters in the area.

Sabin Consulting Engineers Ltd attended the site and performed a visual survey of the entire M&E installations.

A design review of the systems was undertaken to assess the suitability of the systems and the conclusion was that the majority of the existing services would be replaced with new. A detailed design was undertaken with comprehensive set of drawings and specifications prepared to define the required scope of works. Sabin Consulting Engineers also attended the site during the construction phase to monitor the installations